Oil
Pump Test Rig
PROBLEM :
Existing
measurement of oil flow and the subsequent setting
of a flow valve was carried out manually using
calibrated glass Buret. This process was difficult
and typically could take up to 44 minutes to set
an oil pump. The same operator tended to carry out
this task due to the knowledge acquired over time
regarding the 'quirks' of carrying out such a
task. Results were recorded manually for later
transfer to the companies database. Attempted
changes to this process in the past by others had
been thwarted by the low flow rates involved.
|